This Ebike ride will consist of 100% paved roads. Along the way, we’ll ride that portion of Mulholland Drive, known as the Snake.
Make sure you have slime in your innertubes or tires so as to prevent a flat.
MEETUP LOCATION AND TIME: Berniece Bennett Park at 9:00am.
RESTROOMS: At the beginning, end and middle of ride
ROUTE This will be our planned route.
DISTANCE: 27 miles
ELEVATION GAIN: 2900′
DURATION: 4+ hours
BIKE RIDE DESCRIPTION: This will be a loop on paved roads.
THE PACE: 8 MPH on up.
LEVEL: Intermediate
LUNCH: At the end of the ride, as an option, you can join me for lunch at The Stonehause.
MY CELL # IS 805-358-5972

