EBIKE RIDE – MONTECITO & SANTA BARBARA LOOP
Here’s an opportunity for us to see the beautiful upper roads of the Montecito area via our e-bikes again, but this time we’ll do it as a loop instead of an in and out ride. We’ll follow the baseline roads of the Santa Barbara mountain range which include Las Canoas Road, El Cielito Road, West and East Mountain Road and several other roads. Make sure you bring along a spare inner tube.
MEETUP LOCATION: Summerland Beach’s parking lot
TIME: 9:00am.
RESTROOMS: At our meetup location in Summerland as well as a couple of parks during the loop
ROUTE This will be our planned route.
DISTANCE: 28 miles
ELEVATION GAIN: 3800′
DURATION: 5 hours including picnic lunch at the Summerland Beach Park where we are starting and finishing this ride.
BIKE TRAIL DESCRIPTION: 99.9% paved roads
THE PACE: 8 MPH on up.
LEVEL: Easy for e-bikes
MY CELL # IS 805-358-5972